Third Rocket 3 orbital launch attempt and first Rocket 3 commercial flight. Launch failed due to third stage ignition failure. PIRPL will be deployed after NG-16 undocks from the space station. Second set of "global multimedia satellites" built by CAS for KLEO Connect. Jilin-1 Mofang-01A would have been the first fourth-generation Jilin-1 satellite, with a reduced payload mass of 18 kg (40 lb). Rocket failed to achieve correct orbit insertion after a malfunctioning in fairing separation. Second failure in a row for the Hyperbola-1 launcher. Return to flight for Electron following the May 2021 launch failure, flying the Space Force's Monolith satellite as the STP-27RM mission. Nauka was launched along with the European Robotic Arm. A fairing recovery system using parachutes was tested on this launch.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |